Guangdong, China
Brand Name:
Romtronic
Product name:
Wire Harness
Length:
Customized Length
Service:
OEM ODM Accept
Supply Ability
Supply Ability
500000 Piece/Pieces per Month
Packaging & delivery
Packaging Details
1pc/polybag or customized
Port
SHENZHEN
Picture Example:
Lead time:
Quantity(pieces) |
1 - 1 |
2 - 10000 |
10001 - 100000 |
>100000 |
Lead time (days) |
5 |
7 |
30 |
To be negotiated |
We are a professional cable assembly manufacturer in Dongguan, China, which was established in 1997.Our factory is professional in cable assembly for medical equipment cable, consumer electronic cable, automotive electronic cable, industrial automation control cable. Can produce cable products including: USB, HDMI, DP, DC, TRS, AV, RCA, ATA, SATA, SCSI, SAS, IDE, IEEE1394, VGA D-SUB, DVI, LAN, RJ45, RJ11, DIN, RF, LVDS, IDC, VHDCI, AOC, BNC, KEL, Coaxial, Thunderbolt, M8, M12, etc.
Our factory is / SIEMENS / ZEISS / LG / WURTH designated manufacturer for cable assembly, is certified by ISO9001 & ISO14001 & ISO13485 & IATF16949 & UL & CE & MFI & ROHS & REACH & CA65 & EMI. We are one of the top50 cable assembly manufacturers in China, annual production output is around 5,000,000 pieces of cable assembly, the workshop area is around 5,000 square meters, contributed by around 200 workers.
1. Are you the manufacturer? Yes. We have specialized in manufacturing high quality cable assembly and wire harness for more than 24 years.
2. If I don't have any drawings, can you still quote my products? Yes. You can send us photos or samples together with your SPEC, we will quote to you ASAP.
3. Can you supply OEM & ODM service? Yes. We have customized 34,000+ kinds of cables for our partners up to now, we are very experienced in customizing & producing any cables you need.
4. Can you provide samples? Yes, the sample is available to provide for testing or checking quality before bulk ordering. Most of the samples are free(depends on kinds and quantity), but always need you pay for shipping cost.
5. How does your factory control quality? 100% check for every production step. 200% full inspection for finished product: 1st when finished, 2nd before shipment.
6.What is your lead time for mass production? It depends on order quantity and product material. Normal lead time is around 3-5 weeks.